How to Plan a Short Film From Start to Finish
A short film is a small production, not a small amount of planning. The same jobs that run a feature run a five-minute short: a locked script, a schedule, a shot list, a call sheet, and somebody who knows what is left to shoot at four in the afternoon. The difference is that on a short, three people often do all of them. This is the whole job in order, from the script to the festival file, with what you should have in your hand at the end of each stage.
| Stage | The work | Done when you have |
|---|---|---|
| Development | Write and rewrite, table read, decide what it costs | A locked script |
| Pre-production | Breakdown, budget, locations, cast and crew, the look, the shots, the light, the schedule | A schedule and a call sheet for day one |
| Production | The shoot days | Every scene shot, footage backed up twice |
| Post-production | Edit, sound, colour, music, titles | A finished master and its deliverables |
1. Development: get the script right first
Every later decision is made from the script, so changes are cheapest here. A page of screenplay runs about a minute on screen, which makes length a planning decision as much as a creative one: every page you cut is a page you do not have to light, shoot, edit and mix. Shorter films are also easier for festivals to fit into a programme.
Before you lock it, hold a table read, even with friends. Dialogue that reads well on the page often does not in the mouth, and a scene that drags in a living room will drag on screen. Then lock the script and number the scenes. From now on scene 7 is scene 7 on every document; a new scene becomes 7A rather than renumbering everything after it.
Read it once more as a producer. Count the locations, the night scenes, the speaking parts, the cars, the crowd, anything wet, anything on fire. Those are what cost money and time, and if the film you can afford is a different film, this is the moment to rewrite toward it.
2. Pre-production: where the film is actually made
On a short, pre-production is usually longer than the shoot, and it should be. Most problems on a shoot day were decided weeks earlier. Work through it roughly in this order, though plenty of it overlaps.
Break down the script
Go scene by scene and list what each one needs: who is in it, where, day or night, how long it is on the page, and every prop, costume and effect someone has to bring. This is the list the budget and the schedule are built from. We wrote up how to break down a script step by step.
Set a budget, even a small one
Write down what the breakdown will cost: days of crew and kit, locations, food for everyone on every day, travel, art department, insurance, and post-production, which first-time producers most often forget. A short with no money still has a budget; it is just paid in favours, and favours run out. Keep about a tenth aside for what goes wrong.
Find locations, then go back with the crew
Lock locations early, because the schedule is built around them. Visit each one twice: once to choose it, and once on a recce with the director of photography, the gaffer and the sound recordist. Measure the rooms, photograph every wall, find the power, and stand there at the time of day you will shoot. Listen too: a road you did not notice on the first visit can cost you every take. What to write down on that visit is in how to create a location scout report.
Cast and crew
Cast from the script, not from who is free. For crew, a small short can work with a director, a producer who also runs the day, a director of photography, a camera assistant, a gaffer, a sound recordist and someone on art and costume. Do not cut sound: an audience forgives a soft shot far sooner than bad audio.
Decide the look, then the shots
Collect references for the look: frames, colours, light, locations, costume. Then turn the script into shots. A storyboard shows what each shot looks like, and a shot list says how and when to get it: size, lens, movement, duration. You will want both, and the difference between a shot list and a storyboard is worth knowing before you start. If you are unsure of the vocabulary, the guide to shot sizes covers it. The steps from a page of script to a list of shots are in how to build a shot list from a script.
Check the shots against the clock. If a scene is meant to last forty seconds and you have planned twelve shots of eight seconds, something has to go, and it is far cheaper to cut it now than in the edit.
Plan the light
The director of photography and the gaffer draw a lighting plan for each setup: where every lamp stands, how high, what it is pointed at, and what is diffusing or cutting it. It tells the gaffer what to rent and the crew where to rig before the camera team arrives. The three-point lighting guide is a good place to start if the plan is new to you.
Build the schedule
Group the scenes into shoot days: by location first, because moving a unit eats hours, then by day or night, then by actor, so nobody is called for one line on each of three days. A small unit on a short can often manage two to five pages a day, fewer if the scenes are heavy on movement, stunts, children or nights. Lay each day out from the crew call: setup, scenes in order, a meal, company moves, wrap. The guide to shooting schedules goes further.
The paperwork you cannot skip
Get a signed release from everyone who appears on camera, written permission from every location, and a permit where you film in public. Check whether you need insurance; many locations and rental houses will ask for it. The rules differ by country and by city, so ask your local film office or a producer who has shot there before.
Rehearse, and send the call sheet
Rehearse with the cast, ideally in the location. Walk the shot list with the director of photography and the first assistant director so the order of the day is agreed before anyone is paid to stand around. The day before each shoot day, send a call sheet: who is called when, where to go, where to park, what is being shot, the weather, and the nearest hospital. If you have never written one, the free call sheet template lays it out, and the difference between a call sheet and a shooting schedule is worth a read.
3. Production: run the day you planned
Start on time and shoot in the order on the call sheet. Get the scenes that matter most early, while everyone is fresh, and keep an eye on the clock against the schedule after every setup. If you are behind by lunch, decide then what to drop or simplify, not at seven in the evening.
Keep a camera report and take log: every take, which ones were good, which were circled, and what still needs a pickup. At wrap, copy the footage to two separate drives before anyone goes home, and keep a third copy somewhere else as soon as you can. A lost card is the mistake a short can least recover from.
4. Post-production: finish the film you shot
Edit in passes: an assembly of everything in script order, a rough cut, then a fine cut you lock. Picture lock matters, because sound, colour and music are all timed to it and every change after it costs twice. After lock comes the sound edit and mix, the colour grade, music (licensed or composed, never a track you do not have the rights to), titles and credits.
Then make what you will send out: a master file, a version with subtitles, stills, a poster and a short synopsis. Check each festival’s rules before you submit; many have running time limits and premiere requirements.
Common mistakes on a first short
- Shooting a draft instead of a locked script, then fixing the story in the edit.
- Too many locations for the number of days.
- Treating sound as the job of whoever is free.
- No time in the schedule for setup, lunch or company moves.
- No releases signed on the day, which becomes a problem the moment a festival asks.
- Forgetting post-production in the budget.
Read next
All writingHow to Create a Location Scout Report
What goes in a location scout report: photos of every wall, measurements, power, noise, access and permission, with a recce checklist to take with you.
The 9 Documents Every Film Production Needs
Shooting script, breakdown, budget, storyboard, shot list, lighting plan, schedule, call sheet, camera report: who makes each, when, and how they connect.
How to Plan a One-Day Commercial Shoot
Plan a one-day commercial: the brief and deliverables, client sign-off, a shot list cut to the hours you have, a timetable to wrap, the call sheet.
- How to Build a Shot List From a Script
- Milanote vs Frameboard for film pre-production
- How to break down a script for a shoot
- Three-point lighting, drawn on a real floor plan
- What is a camera report? Keeping a take log on set
- StudioBinder vs. Frameboard: How Production Information Connects
- How Many Frames Should a Storyboard Have?
- Call sheet vs shooting schedule: what each one is for
- Best Lens for Interviews: 35mm, 50mm or 85mm?
- How to light a green screen on a budget
- Shot List vs Storyboard: What’s the Difference?